One system for every asset's records, contracts, qualification, calibration and maintenance—approved, traced and ready for inspection.
The problem
Equipment details, AMC contracts, calibration certificates, qualification documents and maintenance logbooks are usually kept by different teams, in spreadsheets and on paper. Contracts lapse unnoticed, preventive jobs slip, and when an auditor asks for an asset's history, it takes days to assemble.
The solution
Asset Management gives every asset one record that holds its general information, AMC, qualification, calibration and maintenance history. Planned and breakdown maintenance follow a controlled workflow from initiation to QA approval, and every action is recorded.
What it manages
Asset Information
Equipment name, identification, serial number, category, location, plant and room, capacity, warranty, manufacturer, model and installation year. Main assets and their sub-assets are linked.
AMC Records & Tracking
Contract history, vendor, status and validity, with contractual versus completed preventive and breakdown visits. Email reminders before a contract expires.
Qualification Records
Qualification, re-qualification, verification and CSV validation history, with URS, IQ and OQ documents attached to the asset.
Calibration Records
Calibration type, schedule and history for each instrument, with who performed it and the supporting documents.
Preventive Maintenance
Weekly, monthly and yearly schedules against a plant work calendar and maintenance procedure, with each planned instance tracked as scheduled, delayed, in process or completed.
Breakdown Maintenance
Ad-hoc jobs raised when equipment fails, run through the same controlled steps as planned maintenance.
Built for regulated plants
Approvals by role
Approver groups by location and department, with a primary approver and group owner, so each step goes to the right people.
Recorded execution
Actions taken, procedure checklist, recalibration and requalification, spare parts used, expenses and documents—captured against the job.
Machine release decision
Record whether the machine may operate—yes, no or partially—with a mandatory justification.
Audit trail & reports
Every login and action is logged by user, asset and date, with reports for inactive assets and maintenance history.
How a maintenance job moves
Step
What happens
Schedule & approval
Engineering creates the schedule; the engineering head and QA approve it.
Initiate
The job is initiated for its planned dates, with the execution checklist and AMC details.
Allocate
The job is assigned to the maintenance technician or group.
Execute
Work, checklist, spare parts, expenses and documents are recorded, and the machine is released or held.
Acceptance
The user department inspects and accepts the work.
QA approval
QA gives final approval, closing the job with its complete trail.
Every maintenance job, traced end to end
The maintenance trail shows each stage of a job, its status, the group responsible, and who completed it and when—from initiation and QA approval through calibration, spare parts and expenses to final acceptance.
When an auditor asks about a piece of equipment, its contracts, qualification, calibration and maintenance history are already in one place.
Keep every asset inspection-ready
See how asset records, contracts, calibration and maintenance come together in one controlled system.